Laserfiche WebLink
10/22/2010 FRI 08:14 FAX 20^'683433 SJC EHD-- 0001 <br /> xxxxxxxxxxxxxxxxxxxxx <br /> *** FAX TX REPORT *** <br /> xxxxxxxxxxxxxxxxxxxxx <br /> TRANSMISSION OX <br /> JOB NO. 3732 <br /> DESTINATION ADDRESS 919099239372 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID <br /> ST. TIME 10/22 08:14 <br /> USAGE T 00' 32 <br /> PGS. 2 <br /> RESULT OE <br /> San Joaquin County <br /> op41'" Environmental Health Department DIRECTOR <br /> _. .G <br /> 600 East Main Street Donna Heran,REHS <br /> k Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> C"•'' ... ,".`F Website:www.s Ov.O Kasey Foley,REHS <br /> Phone: (209)4 <br /> �rFOPet )466-3442020 Linda Turkatte,REHS <br /> October 20, 2010 Fax: (209)464-0138 <br /> Dustin Colley <br /> Island Petroleum Builders, Inc <br /> 7470 SVL Box <br /> Victorville, CA 92395 <br /> Re: Circle K SR0061284 <br /> 16470 Cambridge Street <br /> Lathrop, CA 95330 <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to re-slope the vapor recovery piping to alleviate blockage on the <br /> underground storage tank(UST)system at the above noted address. Excavation is needed to <br /> expose the fiberglass vapor recovery piping. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Thuy Tran at(209)468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Secondary containment testing on the 91 and 87 STP sumps and their product piping. <br /> 4. Since concrete will be broken over the product piping, a secondary containment test <br /> must be performed on all product piping once concrete is poured in accordance with the <br /> manufacturer's guidelines. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> suoervision of an individual Dhvsicallv oresent at the work site who possesses all of the <br />