Laserfiche WebLink
Thuy Tran [EH] <br /> From: Dustin Colley[dustin.island@verizon.net] <br /> Sent: Wednesday, October 20,2010 7:08 AM <br /> To: Thuy Tran[EH] <br /> Subject: Re: Drawing and Scope of Work <br /> Thuy, <br /> We will be uncovering the vapor pipe around both the 87 and 91 ust. We will just be <br /> uncovering enough pipe to correct the slope and fix the blockage issue. No cutting of pipe <br /> should be necessary. If you have anything further, please let me know. <br /> Dustin <br /> On 10/19/2010 2:45 PM, Thuy Tran [EH] wrote: <br /> > Hi Dustin <br /> > When you stated repair the vapor piping, what is the definition of <br /> > repair? Will vapor piping be replaced? Will vapor piping be for both <br /> > the tanks? Will it be cleaned out or will it be re-sloped at a <br /> > different angle? <br /> > If any equipment to be used to replace anything, please submit cut <br /> > sheets/ manufacturer's specification sheets showing 3rd party approval. <br /> > Thanks <br /> > Thuy <br /> > -----Original Message----- <br /> • From: Thuy Tran [EH] <br /> > Sent: Tuesday, October 19, 2010 2:37 PM <br /> > To: 'Dustin Colley' <br /> > Subject: RE: Drawing and Scope of Work <br /> > Hi Dustin <br /> > Found it. Working on the permit approval letter. Will fax approval <br /> > letter when receive approval from supervisors. <br /> > Thuy <br /> > -----Original Message----- <br /> • From: Dustin Colley [mailto:dustin.island@verizon.net] <br /> > Sent: Tuesday, October 19, 2010 10:45 AM <br /> > To: Thuy Tran [EH] <br /> > Subject: Re: Drawing and Scope of Work <br /> > Thuy, <br /> > I shipped the drawings and application to you. Can you please confirm <br /> > receipt, so that I may know that you have received them. We have been <br /> > given a deadline from the APCD to repair this. I hope that your <br /> > department can process this application promptly. Thank you. <br /> > Dustin <br /> > On 10/12/2010 8:22 AM, Thuy Tran [EH] wrote: <br /> >> Hi Dustin <br /> >> Thank you for the scope of work and site map of excavation area. A <br /> >> permit is required since the area excavated will be above the tanks <br /> >> and the product lines from the tanks to the dispensers. I'm sure the <br /> >> tanks are double wall continuously monitored with brine <br /> >> hydrostatically, so a secondary containment testing on the tank <br /> >> annular is not needed. A primary piping soap test will be required <br /> > when work is completed. <br /> >> The permit application can be found at <br /> 1 <br />