Laserfiche WebLink
D. Results of Testing/Servicing RECEIVED <br /> Software Version Installed: 329.01 MAY 11 2017 <br /> Complete the following checklist: 1�.�,111I�0i�msN FAL VIE.!,.rTH <br /> "W mow. . <br /> ® Yes ❑ No* is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ®Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> onitoring station, is all communications equipment (e.g., modem) <br /> ® Yes ❑ No* [f alarms are relayed to a remote m <br /> ❑ N/A operational? <br /> N Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate, or is electrically disconnected? if yes: which sensors initiate <br /> positive shut-down? (Check all that apply) NSumplTrench Sensors; M Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? N Yes; ❑ No. <br /> VYesO For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90% <br /> Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below.Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product; N Water. if yes,describe causes in Section E,below. <br /> Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports,if applicable is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments:PUMPED OUT 2 GALS. OF WATER FROM 91 ANNULAR SPACE. ALARM DID <br /> NOT CLEAR. REPLACED 420 SENSOR-ALARM CLEARED. <br /> Monitoring Certification Test Report 2 of 4 <br />