Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for COUNTRY MARKETPLACE as of November28, 2017. <br /> Open violations from March 07, 2017 inspection <br /> Violation #109 - Failed to test secondary containment. <br /> Secondary containment testing was last performed on July 16,2012 and was due by July 2015 . Testing has not <br /> been completed and is 20 months past due. According to the test results from July 14,2015, the 87 north piping line <br /> and the UDC 11112 were not tested. Secondary containment testing is required once every 36 months. <br /> Immediately schedule this test and provide 48 hours notification to the EHD. <br /> Failure to resolve this violation may result in a red tag of the underground tanks and will prevent fuel deliveries. <br /> Violation#314- Failed to have secondary containment or secondary containment not tight. <br /> The tertiary (rock guard) piping for the fuel lines were open in both the 87 and 91 submersible turbine pump sumps. <br /> The technician installed and tightened the tertiary boots. <br /> This was corrected on site. <br /> The July 14, 2415 secondary containment test results indicate a failure at the 91 annular, UDC 516, and the UDC <br /> 9110. . All secondary containment for the UST system must be tight. Immediately have a properly licensed, trained, <br /> and certified contractor repair or replace the failed component under permit and inspection of the EHD. <br /> Failure to resolve this violation may result in a red tag of the underground tanks and will prevent fuel deliveries. <br /> Open violations from March 08, 2016 inspection <br /> Violation #109 - Failed to test secondary containment. <br /> Secondary containment testing was last performed on July 16, 2012 and was due by July 2015. Testing has not <br /> been completed for all components and is 8 months past due. According to the test results from July 14, 2015, the <br /> 87 north piping line and the UDC 11112 were not tested. Secondary containment testing is required once every 36 <br /> months. Immediately schedule this test and provide 48 hours notification to the EHD. <br /> Violation #314 -Secondary containment not tight. <br /> The July 14, 2015 secondary containment test results indicate a failure at the 91 annular, UDC 516, and UDC 9110. <br /> All secondary containment for the UST system must be tight. Immediately have a properly licensed, trained, and <br /> certified contractor repair or replace the failed component under permit and inspection of the EHD. <br /> Page 1 of 1 <br />