Laserfiche WebLink
Emily Crain <br /> B. Z. Service Station Maintenance <br /> Phone: 916-371-2380 <br /> Fax: 916-572-0150 <br /> Email: emily(ftzmaint.com <br /> From: Emily Crain [mailto:ECrain(a)wavecable.com] <br /> Sent: Wednesday, March 01, 2017 11:45 AM <br /> To: 'Stacy Rivera [EH]'; 'Garrett Backus [EH]' <br /> Cc: 'Harp Gill'; 'Kimberly Blackwell [EH]' <br /> Subject: FW: Country Market Place 1789 W Charter, Stockton <br /> Please see below and attached for the parts list, scope of work, certs and specs for the boot repairs for <br /> Country Market Place. We began the permit process several months ago and were waiting on whether we <br /> were using Icon or Bravo boots. We were waiting for manufacture information and never got anything. We went <br /> back out to the site to get a more definite listing of what is needed. It is below and attached. Sorry for the long <br /> delay. <br /> What else do we need to do to move forward with the repairs and retesting for the SB989? <br /> Thanks <br /> Emily Crain <br /> B. Z. Service Station Maintenance <br /> Phone: 916-371-2380 <br /> Fax: 916-572-0150 <br /> Email: emily(a)-bzmaint.com <br /> From: Mark Vendeiro [mailto:m.vendeiro(a)att.net] <br /> Sent: Sunday, February 12, 2017 5:32 PM <br /> To: Emily Crain <br /> Subject: Country Market Place <br /> Emily, <br /> I finally have the parts for Country Market Place. <br /> Unfortunately, will will have to remove concrete on both sides of the dispensers to replace some of <br /> the penetration fittings because the original fittings were installed backwards. That is, the part that is <br /> supposed to be inside the udc's is on the outside. <br /> This is what we need to replace the penetration fittings on dispenser 5/6, 9/10, 11/12 and excavate <br /> the tank annular that has failed its testing. There is NO guarantee that we will be able to resolve the <br /> annular problem. We will excavate to the top of the tank and replace the annular riser. If this is not the <br /> problem then the tank may have to be replaced. <br /> For the submittals - Bravo F07-Retrofit-S for the 3/4" electrical penetrations (6 total) <br /> - Bravo F10-Retrofit-S for the 1" electrical penetrations (3 total) <br /> - Bravo F-20-Retrofit-S for the 2" frp vapor recovery pipes (3 total) <br /> - Bravo FLX-2.0-Retrofit-S for the product pipes (12 total) <br /> 5 <br />