Laserfiche WebLink
SAN JOAQUIN Environmental Health Department <br /> COUNTY Linda Turkatte, REHS, Director <br /> - - Kasey Foley, REHS, Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Rodney Estrada, REHS <br /> Willy Ng, REHS <br /> Muniappa Naidu, REHS <br /> February 1 , 2018 <br /> Franzen Hill <br /> Attn : Darren Thomas <br /> 1100 North J Street <br /> Tulare, CA. 93274 <br /> Re : Country Marketplace SR0078652 <br /> 1789 W. Charter Way <br /> Stockton , CA, 95757 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to remove product line entries at the Under Dispenser Containment on <br /> dispensers 5/6 , 9/10 and 11 /12 and install new Diversified penetrations and test boots on the <br /> underground storage tank ( UST) system at the above noted address. Work is proposed to be <br /> completed in phases by disconnecting product lines at the T junction after the Submersible Turbine <br /> Sump (STP) . The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones . <br /> 3 . Contact Cesar Ruvalcaba at (209) 953-6213 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments) . Please be aware that inspections <br /> for emergency work must be scheduled within five days of permit approval . <br /> a . 24-hour hydrostatic test (or equivalent) on UDC sumps 5/6 , 9/10 , and 11 /12 , after backfill <br /> and concrete is poured . <br /> b . One hour pressure test for 91 and 87 octane secondary piping at dispensers 5/6 , 9/10 and <br /> 11 /12 , per manufacturer's guidelines . If there are no manufacturer's guidelines , test shall <br /> be performed using an applicable method specified in an industry code or engineering <br /> standard , after backfill and concrete is poured . <br /> c. A 0 . 1 gallon per hour test by a licensed SWRCB Tank Tester shall be conducted on the 87 <br /> and 91 octane primary piping . <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4 . If concrete will be broken near the tank, a secondary containment test must be performed on <br /> the affected USTs once concrete is poured in accordance with the manufacturer's guidelines <br /> 1868 E. Hazelton Avenue I Stockton , California 952051 T 209 468-3420 1 F 209 464-0138 1 www, sjcehd . com <br />