My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2005 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:48:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2010
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2005 - 2010 .PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2010
QuestysRecordDate
5/17/2017 6:13:49 PM
QuestysRecordID
3384372
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: Manufacturer • Industry Standard Professional Engr Other(see below) <br /> Test Method Uses: • Pressure c vacuum c Hydrostatic Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 Line#3 Line#4 <br /> Tank product _Gasoline-91 Gasoline-89 Gasoline-87 Diesel <br /> Pipe manufacturer Centron Centron Centron Centron <br /> Pipe material FRP FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 2 <br /> Secondary pipe diameter (inches) _ 3 _ 3 _ 3 3 _ <br /> Method of secondary pipe isolation Clamshell Clamshell Clamshell Clamshell <br /> Location of secondary pipe isolation Sump Sump Sump Sump <br /> Estimated length of piping run (feet) <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hrmin) _ 0:02 0:02 0:02 0:02 <br /> Test start time 9:25 AM 9:27 AM 11:55 AM 9:40 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 5.0 <br /> Test end time 10:25 AM 10:27 AM 12:55 PM 10:40 AM <br /> Final pressure(psig) 5.0 5.0 5.0 5.0 <br /> Test duration (hrmin) 1:00 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 _ 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 _ 0.5 0.5 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.