Laserfiche WebLink
UNDER DISPL.SER CONTAINMENT P DC) TESTING <br /> Test Method By: O Manufacturer • Industry standard Professional Engr o Other(see below) <br /> Test Method Uses: O Pressure Vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp# 1/2 Disp# 3/4 Disp # 6/6 Disp#7/8 <br /> UDC manufacturer Bravo _ Bravo Bravo Bravo <br /> UDC material Steel Steel _ Steel Steel <br /> UDC depth (inches) 9 9 —9 - — 9 <br /> Height from UDC bottom to highest Bottom Bottom Bottom Bottom <br /> piping penetration - <br /> Height from UDC bottom to lowest Bottom Bottom Bottom Bottom <br /> electrical penetration <br /> Condition of UDC prior to testing pry Dry Dry Dry_ _ <br /> Portion of UDC tested Entire Entire Entire Entire <br /> Type of shut-down present Float Float Float Float <br /> Was sensor removed for testing? N/A N/A N/A N/A <br /> Was sensor properly replaced after testing? N/A N/A N/A N/A <br /> Depth of water level from UDC bottom (in.) - _ 6 6 6 6 <br /> Wait time for water level to stabilize (hr:min) _ 0:10 0:10 0:10 0:10 <br /> Test start time 1:24 PM 1:24 PM 1:24 PM 1:24 PM <br /> Initial Probe Reading 1.5639 2.8823 3.2645 3.9307 <br /> Test end time 1:40 PM 1:40 PM 1:40 PM 1:40 PM <br /> Final Probe Reading _ 1.5655 2.8824 3.2639 3.9306 <br /> Test duration (hr:min) 0:16 0:16 0:16 0:16 <br /> Change in water level (t 0.0000 inches) 0.0016 0.0001 -0.0006 -0.0001 <br /> Pass/Fail threshold (10.0020 inches l;Hr.) 0.0.020 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />