Laserfiche WebLink
Facility_Marada Chevron 40 Address_10878 N.Hwy 99 Date 0/06 Page?of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ✓piping Manufacturer Industry Standard Professional Engineer <br /> Test Method Used: ✓Pressure Vacuum Hydrostatic <br /> Test Equipment Used: 3.5"gauges Equipment Resolution: .2 psi <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Destination: 87 Unleaded 89 Unleaded Plus Premium Diesel <br /> Piping Material: FRP FRP FRP FRP <br /> Piping Diameter: 3" 3" 3„ 3„ <br /> Length of Piping Run: <br /> Method and location of Test Boots in Sumps Test Boots in Sumps Test Boots in Sumps Test Boots in Sumps <br /> piping-run isolation: and UDC'S and UDC'S and UDC's and UDC's <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min minimum 15 min minimum 15 min minimum 15 min minimum <br /> starting test: <br /> Test Start Time: 2:05 pm 10:25 am 2:17 pm 10:25 am <br /> Initial Reading(RD: 5 psi 5.4 psi 5 psi 5.5 psi <br /> Test End Time: 3:05 pm 11:25 am 3:17 pm 11:25 am <br /> Final Reading(RF): 5 psi 5.4 psi 5 psi 5.5 psi <br /> Test Duration: I hr I hr 1 hr 1 hr <br /> Change in Reading(RF-Rt): 0 0 0 0 <br /> Pass/Fail Threshold or 2 psi .2 psi .2 psi .2 psi <br /> Criteria: <br /> Test Result: 4 Pass ❑Fail 1 J Pass ❑Fail 1 J Pass ❑Fail Pass ❑Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />