Laserfiche WebLink
Ref item# 27: Annual line tightness test. <br /> Monitoring system reconfigured to effect a failsafe condition thereby <br /> eliminating the requirement for an annual line tightness test(see copy of <br /> BEI Invoice#3796 to Shawn Corporation attached for your review). <br /> Ref item# 14: Primary containment is product tight. <br /> As noted in your inspection the diesel seepage on dispenser# I & #2 <br /> dispenser filter assembly has been an on-going problem and has been <br /> addressed by SSSE Co and Elite IV on three different occasions. <br /> However, on 01/31/2006 Elite IV removed and replaced the filter <br /> assembly and stopped the seepage(see copy of Elite IV job work order <br /> and time card# 12031). <br /> Ref item#23: Designated Operator, etc. <br /> Noted. Designated Operator(myself) should have provided better <br /> documentation in the USTDO monthly report on the alarm problems <br /> encountered as noted in item# 7 above. <br /> Please call at your earliest convenience with any questions you may have. <br /> Sincerel <br /> Jos Bagley J <br /> Project Manager/Designated Operator for Shawn Corporation <br /> Encl: Cert. & CFO ltr, SSSE W/O; BEI Inv; Elite IV W/O <br /> CC: Mike Ali, Shawn Corporation <br />