Laserfiche WebLink
D. Results of Testing/Servicin <br /> Software Version Installed: <br /> "o <br /> Complete the following checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment wil <br /> not interfere with their proper operation? <br /> Cl Yes �❑ Ngo** If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem; <br /> GrIT/A operational? <br /> es ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Ergump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes; El- <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (Le. no <br /> N/A mechanical overfill prevention,valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger?--% <br /> ❑ Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* ❑ No Was liquid found ' ide any secondary containment systems designed as dry systems? (Check all that appl)) <br /> ❑ Product; Water. If yes, describe causes.in Section E,below. <br /> ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: SYirnPS - <br />