Laserfiche WebLink
ENVIROPMENTAL HEALTI?DEPARTMENT <br /> Pp U,IN SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran,R.E.H.S. Carl Borgman,R.E.H.S. <br /> i 304 East Weber Avenue, Third Floor <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> AlOlsen,R.E.H.S. Stockton, California95202-2708 <br /> ' Douglas W. Wilson,R.E.H.S. <br /> �.., P. Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> F6RN Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.E.H.S. <br /> ogram Manager Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> (IP <br /> March 11,20 � <br /> Valued Engineering <br /> Attention:Durae Cornell <br /> 1659 Lucerne Ave <br /> Stockton CA 95203 <br /> Fax: 209 464-3565 <br /> RE: 10878 N.HWY 99, Stockton—SR0041417 <br /> The San Joaquin County Environmental Health Department (SJCEHD) has received the permit to replace <br /> existing spill buckets and to install overfill prevention device at the above referenced location. The <br /> permit has been approved with the following conditions: <br /> 1. Contact the local fire department, and the San Joaquin Valley Air Pollution Control District for <br /> applicable permits and requirements. <br /> 2. Any changes in information or scope of work must be submitted to SJCEHD prior to <br /> commencing work. <br /> 3. At least one person who holds the International Code Council "UST Installer/Retrofitter" <br /> certification must be onsite AT ALL TIMES when work is performed. <br /> 4. A "Certificate of Compliance for Underground Storage Tank Installation Form C" shall be <br /> submitted by the owner or the owners' agent[pursuant to California Code of Regulation (CCR) <br /> 2635(d)]before this upgrade will be considered complete by SJCEHD. <br /> 5. Contact Michelle Le at(209)468-9847 to arrange the following inspection appointments; a 48- <br /> hour notice for inspection appointments is required. <br /> a. Corrosion protection: prior to backfilling around the spill buckets, corrosion protection of <br /> the risers must be verified. <br /> In. Overfill prevention: overfill prevention system in compliance with CCR 2635 (b)(2)must be <br /> verified. <br /> c. Spill Bucket: after concrete was poured, spill bucket with minimum of 5 gallon capacity and <br /> a 30-minute lake test in compliance with CCR2635(b)(1) must be verified. <br /> d. Third party tank integrity tests must be performed once concrete is poured,prior to the <br /> contractor signing off of the jobsite. The test results must be submitted to SJCEHD within 7 <br /> days of completing this project. <br /> 6. Permit expires 90 days from the approval date. Note: if an extension to the expiration date <br /> is required, a written request must be received by this office prior to the expiration date. <br /> Thank you �. <br /> Michelle Le,REHS <br /> Senior Registered Environmental Health Specialist <br />