Laserfiche WebLink
0 • <br /> SWRCB,January 2002 Pa,-,e of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer C Industry Standard Professional Engineer <br /> ❑Other(Spec ) <br /> Test Method Used: ❑Pressure 7 Vacuum D Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:INCON Equipment Resolution: <br /> Sump#87 Sump#Q1 n Sump 491 S Sump#diesel <br /> Sump Diameter: 48.00" 48.00" 48.00" 48.00" <br /> Sump Depth: 55.00" 57.00" 60.00" 62.00 <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 14.00" 14.00" 14.00" 14.00" <br /> -Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> 12.00" 12.00" 12.00" 12.00" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: clean clean clean clean <br /> Portion of Sump Tested' 18.00" 18.00" 18.00" 18.00" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No a NA ❑Yes ❑No NA Yes No , NA ❑Yes ❑No NA <br /> product and water)?* <br /> Turbine shutdown response time n/a n/a n/a n/a <br /> Is system programmed for fail-safe ❑Yes 7 No Ci NA ❑Yes ❑No NA ❑Yes ❑No 7 NA ❑Yes ❑No NA <br /> shutdown?* <br /> Was fail-safe verified to be 7 Yes ❑No Z NA ❑Yes n No 7 NA 7 Yes 7 No L+7 NA ❑Yes ❑No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: Please See ancon results <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: Pass Fail K Pass ❑Fail L Pass L Fail W Pass ❑Fail <br /> Was sensor removed for testing? Yes No NA n Yes [=i No ❑NA Z Yes 0 No 7 NA V Yes []No l.=i NA <br /> Was sensor properly replaced and ;Yes ❑No ❑NA <br /> verified functional after testing? 0 Yes F1No 11NA 0 Yes 7 No El NA 0 Yes No FN.A <br /> Comments— (include information on repairs made prior to testing, and recommendedfolloi.v-up forfailed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />