My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:48:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
5/17/2017 4:28:22 PM
QuestysRecordID
3383804
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN 10 A Q U I N Environmental Health Department <br /> COl_JNTY <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br /> to the applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the <br /> location of the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties (north toward <br /> the top of the page), nearby septic tanks, leachfields, water wells, buildings, underground public utility <br /> lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to dispensers. <br /> If underground utilities are not included on the site map, you must state in writing that USA Dig will be <br /> contacted prior to excavation activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR <br /> PIPING REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third <br /> party from the contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee <br /> Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a <br /> "Backfill Excavation Certificate" as required by the San Joaquin County Building Department. If a <br /> "Backfill Excavation Certificate" is required by any incorporated areas (cities), submit to the <br /> appropriate City Building Departments, pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately <br /> completed plan. If gross deficiencies are identified, an addendum will be required with a $152.00 per <br /> hour fee and the review will begin on the date of resubmittal. <br /> [] 8. Advance inspection notice of at least 48 hours is required by the <br /> Environmental Health Department (EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit <br /> (LEL) atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), <br /> and barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be <br /> the project manager's responsibility for compliance with all health & safety regulations and requirements, <br /> including confined space requirements, which shall be strictly adhered to at all times during the course of <br /> the underground storage tank (UST) activities. <br /> [] 10. The EHD permit shall be on site during all UST permit-related activities. <br /> [J 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to <br /> any work must be described in detail on pages 3 &4 and be shown on the detailed site map. <br /> RECENED <br /> JUN 0 5 2018 <br /> ENV iRONM ENTAL <br /> yEn _ PaaTMENT <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.