Laserfiche WebLink
To: Elena Manzo Page 10 of 11 2018-08-29 19:10:31 (GMT) 17076380484 From: Nucleus Pump Services <br /> Reverse Ratio Piston / Poppet Combination <br /> Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to. <br /> This smaller piston area keeps the leak detector in the fast fill position (3 GPM)to a higher line pressure while <br /> compressing vapor pockets and expanding flexible pipes faster. This means less time to full flow. The leak <br /> detector does not have to completely reset (as with competitive leak detectors) for the poppet to be forced <br /> into the reset mode at pump start-up. <br /> Smaller Volume / Faster Response Piston Size <br /> With a reduced piston size, there is one-fourth the fuel volume to replace when in leak search and one-fourth <br /> the fuel volume to return to the line when the pump turns off. This combination makes for a more responsive <br /> and faster leak detector. Less volume to leave the line for the leak detector to reset and catch leaks. Less <br /> volume to fill and provide full flow for dispensing! <br /> Superior Flex-Pipe Performance <br /> The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br /> shock. This results in enhanced performance with steel and fiberglass pipe, and especially with today's <br /> flexible pipe. <br /> 99 LD-2000\E <br /> In the early 1990's,the first commercially successful flexible pipe,Total Containment PP-1500,was introduced <br /> to the U. S. petroleum industry. Due to the flexibility of this pipe system, no line leak detection would work. <br /> In 1992, the Vlmli LD-2000\E was certified for 3 GPH @ 10 PSI on Total Containment PP-1500 pipe. The <br /> 99 LD-2000\E is still required for existing PP-1500 pipe. Additionally, today the 99 LD-20001E is used in <br /> sites that have the same line characteristics as the LD-2000\E was originally certified for, even though the <br /> pipe is different. The original certification of the LD-20001E concerned the bleed-back modulus of PP-1500 <br /> pipe. Today, lines with high bleed-back (generally above 600 ml.) and high head pressure may require the <br /> 99 LD-2000\E to pass a field test for annual certification. Consult with factory before ordering and installing <br /> the 99 LD-2000\E. <br /> Electronic Line Leak Detection Upgrade! <br /> The 99 LD-2000 may be upgraded in the field to eliminate thermal induced slow-flow, provide submersible <br /> shut-down,and alarm notification to site monitoring equipment. Request information on the ISM-4080,an easy <br /> upgrade for existing or new installations. The ISM4080 also stages turbines and controls solenoid valves for <br /> loading racks and marine applications. If there is no need for staged turbines, solenoid valve control, alarm <br /> notification or submersible shut-down, request information on the ARM-4073 to eliminate false alarms only/. <br /> E C I +' E D <br /> AUG 2 9 2018 <br /> ENVIRONMENTAL_ <br /> HEALTH {DEPARTMENT <br /> 5A00 <br />