My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
2300 - Underground Storage Tank Program
>
PR0231600
>
COMPLIANCE INFO_1986-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
11/8/2018 9:48:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2008
RECORD_ID
PR0231600
PE
2361
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\14800\PR0231600\COMPLIANCE INFO 1986-2008.PDF
QuestysFileName
COMPLIANCE INFO 1986-2008
QuestysRecordDate
8/30/2017 6:29:37 PM
QuestysRecordID
3613342
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr~ 21 02 11 : 36a F1i*v Contractors Inc 20946 142 p. 2 <br /> ARB Approved IOM—Healy/Veeder-Root Phase II EVR System—VR-202-A (Ovation Dispenser) . Page 119 <br /> WAYNE-DRESSER OVATIONTIM SERIES DISPENSER RETROFIT <br /> for HEALY SYSTEMS, INC. <br /> MODEL VP1000 <br /> VAPOR RECOVERY ASSIST SYSTEM <br /> (KIT Z079) <br /> OUTLINE <br /> 1. Purpose <br /> 2. Safety <br /> 3. Models Covered <br /> 4. Parts Lists <br /> 5. Tools Required <br /> 6. Dispenser Access <br /> 7. Survey Scope Of Work <br /> 8. Wayne-VAC Removal <br /> 9. Balance Removal <br /> 10. Installing The Healy VP1000 System <br /> 11. Connecting Vapor Lines <br /> 12. Installing The Sealed Nipple Assembly <br /> 13. Wiring Inside The Electronics Compartment <br /> 14. Connecting Healy Systems Dispensing Equipment <br /> 15. VP1000 Theory Of Operation <br /> 16. Testing The System <br /> 17. Trouble Shooting The VP1000 <br /> 18. VP1000 Vane & Rotor Service & Replacement Guide <br /> Start-up/ New Installation/Warranty/Annual Testing Form (Rev. 04/05) <br /> Healy Systems, Inc. Website: http://www,healysystem.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual(August 31, 2005) Fax: 603.882.5189 <br /> OMMUNMEMMMOft <br /> Healy Systems. Inc. —the innovative leader of Stage lI vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.