Laserfiche WebLink
Hph 21 02 11 : 37a Elite Iv Contractors Inc 2094612 p. 5 <br /> ARB Approved IOM- HealyN•er-Root Phase II EVR System-VR-202-A (Ovation Dispenser) Page 122 <br /> r dr <br /> 4 <br /> k 1It <br /> „w w� <br /> a. <br /> PHOTO C PHOTO D <br /> HARDWARE KIT Z079H: (See Photo B) <br /> 2 ea flat head 114-20 x 5/8 bolts, washers, and nuts <br /> 4 1/4 - 20 x 1/2" sheet metal screws <br /> 1 Washer-seal assembly (For use when removing Wayne-VAC electrical) <br /> 1 Pump mounting bracket <br /> ELECTRICAL KIT Z079E: (See Photo C) <br /> 1 Current change label (pin 1405) <br /> 7 Wire nuts <br /> 1 8-32 TinnermanTM threaded fastener <br /> 1 8-32 x 518" pan head screw with washer <br /> 1 112" x 3" electrical nipple <br /> 1 1/2" capped electrical elbow <br /> 1 112" electrical elbow <br /> 1 1/2" electrical union <br /> 3 1/2" x 3/4" electrical reducing bushings <br /> 1 Explosion proof J box <br /> Healy Systems, Inc. Website. http:llwww.healysystem corn <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603 882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (August 31. 2005) Fax: 603.882.5189 <br /> VAMMENNUMOMMP <br /> Healy Systems, Inc.—the innovative leader of Stage tI vapor recovery equipment <br />