Laserfiche WebLink
Sep 19 06 09: 13a E1it6Iv Contractors Inc 209 02 p. 3 <br /> Reverse Ratio Piston / Poppet Combination <br /> Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to. <br /> This smaller piston area keeps the leak detector in the fast fill position (3 GPM) to a higher line pressure <br /> while compressing vapor pockets and expanding flexible pipes faster. This means less time to full flow.The <br /> leak detector does not have to completely reset (as with competitive leak detectors) for the poppet to be <br /> forced into the reset mode at pump start-up. <br /> Smaller Volume / Faster Response Piston Size <br /> With a reduced piston size,there is one-fourth the fuel volume to replace when in leak search and one-fourth the <br /> fuel volume to return to the line when the pump turns off.This combination makes for a more responsive and <br /> faster leak detector.Less volume to leave the line for the leak detector to reset and catch leaks.Less volume <br /> to fill and provide full Now for dispensing! <br /> Superior Flex-Pipe Performance <br /> The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br /> shock. This results in enhanced performance with steel and fiberglass pipe, and especially with today's <br /> flexible pipe. <br /> 99 LD-2000\E <br /> In the early 1990's,the first commercially successful flexible pipe,Total Containment PP-1500,was introduced <br /> to the U.S.petroleum industry. Due to the flexibility of this pipe system, no line leak detection would work. <br /> In 1992,the LD-2000\E was certified for 3 GPH @ 10 PSI on Total Containment PP-1500 pipe. The <br /> 99 LD-2000\E is still required for existing PP-1500 pipe. Additionally, today the 99 LD-2000\E is used in <br /> sites that have the same line characteristics as the LD-2000\E was originally certified for, even though the <br /> pipe is different. The original certification of the LD-2000\E concerned the bleed-back modulus of PP- <br /> 1500 pipe. Today, lines with high bleed-back (generally above 600 ml.) and high head pressure may <br /> require the 99 LD-20001E to pass a field test for annual certification. Consult with factory before ordering <br /> and installing the 99 LD-2000\E. <br /> Electronic Line Leak Detection Upgrade! <br /> The 99 LD-2000 may be upgraded in the field to eliminate thermal induced slow-flow, provide submersible <br /> shut-down, and alarm notification to site monitoring equipment. Request information on the ISM-4080, an <br /> easy upgrade for existing or new installations. The ISM-4080 also stages turbines and controls solenoid <br /> valves for loading racks and marine applications. If there is no need for staged turbines, solenoid valve <br /> control,alarm notification or submersible shut-down, request information on the ARM-4073 to eliminate false <br /> alarms only. <br /> 5.000 <br />