Laserfiche WebLink
D. Results of Testing/Servicing . <br /> ) / 4 <br /> Software Version Installed: TSS t� ,Vic/) /F�G rC T AA3 . f ` <br /> Complete the following checklist: <br /> O"ges ❑ No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> ❑ Yes o* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g, modem) <br /> �A operational? <br /> a''yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> 2®� ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> G ti 5 positive shut-down? (Check all that apply) ❑Suinp/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confi m positive shut-down due to leaks and sensor failure/disconnection? Cl Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> LiY[q/A mechanical overfill prevention,valve is installed), is the overfill warning alarm visible and audible at}he tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E, below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product, ❑Water. If yes, describe causes.in Section E, below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,if applicable <br /> ❑ Yes ILI No- .1 Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below, describe now and when these deficiencies were or will be corrected. <br /> E. Comments: Th -P s re r-1 R� 4 Lf a r r <br /> e <br /> r cy �a ry <br /> Li ✓i d _1,L2 1, t v 0 IM f A u B <br /> V SC9 <br /> � Cf fZ? DY`4 f So <br /> I <br /> 40 <br />