My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/13/2012 15:24 0000000 PAGE 04/06 <br /> Secondary Containment Testing Report Form-Page 3 of 5 <br /> F. Testing of Piping Sumps/Turbine Sumps ❑N/A(No pipineturbine sumps) <br /> Test Method Developed By.: ®Sump Manufacturer; ❑ Industry Standard;❑PE;❑Other(Specify): <br /> Test Method Used: ❑Pressure; ❑Vacuum; ®Hydrostatic; ❑Other(Specify): <br /> Test Equipment Used: Incon TS-STS Equipment Resolution:0.001" <br /> Sump#: Red Diesel <br /> STP Sump#:87 STP Sump#: Sump#:4 <br /> Sump Diameter(inches): 42 42 <br /> Sump Depth(inches): 48 48 <br /> Sump Material: FRP FRP <br /> Height from Tank Top to Top of 14" 14" <br /> Hi hest Pipe Penetration inches : <br /> Height from Tank Top to Lowest 24" 24" <br /> Electrical Penetration(inches): <br /> Portion of Sump Tested: Bottom Half Bottom Half <br /> If turbine shuts down when sump [I N/n ❑N/AO NIA ❑N/A sensor detects liquid,specify minums, minutes. minutes. minutes, <br /> turbine shutdown response time. <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes. 15 minute. minutes. 15 minutes. <br /> starting test: <br /> Test Start Date/Time: 9:07 9:29 11:08 11:27 <br /> Initial Reading(Rt): 3.423 3.41.8 1.713 1.718 <br /> Test End Date/Time: 9:22 9:44 11:23 11:43 <br /> Final Reading(Ry): 3.422 3.417 1.714 1.718 <br /> Change in Reading(Rr—R,): 0.001 0.001 0.001 0.00 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> Test Result: ®Pass; ❑Fail ®Pass; ❑Fail ❑.Pass; ❑Fail ❑Pas%; ❑Fail <br /> Was leak detection sensor <br /> properly replaced and verified as ®Yes;❑No; ❑ ❑No; ❑Yes;❑No; ❑Yes; [:]No; <br /> functional after testin 7 ❑N/A(Not Removed) LJ N/A <br /> N/A(Not Rcmuved) ❑NIA(Notcmovc <br /> nt Rd) ❑N/A(Not Removed) <br /> G. Testing of Under-Dispenser Containment (UDC) ❑N/A(No dispensers or no UDC) <br /> Test Mcthod Developed By JZ UDC Manufacturer;❑Industry Standard:❑PE;❑Other(.Spec): <br /> Test Method Used: ❑Pressure; ❑Vacuum; ®Hydrostatic; ❑Other(Spec): <br /> Test Equipment Used:Incon TS-STS Equipment Resolution:0.001 <br /> UN-1194•3/5 www.unidoes.mR 0271fuD2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.