My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 3550 HWY 99,STOCKTON,CA 95215 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> . . <br /> Date map was drawn: 03/ 12/ 10 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On <br /> your site plan,show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control <br /> panels;sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line <br /> leak detectors;and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 12/07 <br /> 1 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.