Laserfiche WebLink
Monitoring System Certification • <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIRequipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring.. <br /> Complete the following checklist: <br /> MEas Has all input wiring been inspected f=annry and termination,including testing for ground faults? <br /> Were all tank gauging probes visuallor damage and residue buildup?Was accuracy of system product levested?Was accuracy of system water level ed?* Were all probes reinstalled properly?* Were all items on the equipment mamaintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> FOYe <br /> e the followingchecklist:No* For equipment start-up or annual equipment certification, was a.leak simulated to verify LLD performance? <br /> N/A (Check all that apply) Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> No* Was the testing apparatus properly calibrated?No* For mechanical LLDs,does the LLD restrict productflow if it detects a leak? <br /> N/A <br /> No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/ANo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabledN/A or disconnected?No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system N/A malfunctions or fails a test? <br /> g Yes ❑ No* For electronic LLDs,have all accessible wiring connections been;isually inspected? <br /> ❑ N/A <br /> g Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: CPT Controller failed the 3 GPH @ 10 psi test. <br />