My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> CORRECTIVE ACTIONS MAR 16 2017 <br /> ENVIRONMENTAL HEALTH <br /> #105: The required changes for the leak sensor modEPIPfrTiMENT <br /> 407 to 409 have been made. Also, we have included the <br /> monitoring plan for all the USTs separately even though it is <br /> identical for all USTs. We are attaching the copy for the <br /> department review. <br /> #107: UST monitoring site plan has been updated as required <br /> and we are attaching a copy of the updated version which <br /> shows sensor under dispenser 3-4 and correct leak detector <br /> (99LD-2000). <br /> #111: Reason for the delay was due to confusion over last year <br /> testing dates, but going forward with the advice of D.O. we will <br /> make sure that we have correct testing dates and it must be <br /> done in a timely manner. <br /> #112: As we mentioned above, we will take all necessary steps <br /> to perform testing on time. <br /> #113: We are sorry that your office had not received test report <br /> within 30 days. We already talked to service provider to <br /> prevent this in the future. <br /> #201: We hereby attaching the copy of Annual monitoring <br /> system certification report for 11/25/2014 testing. We also <br /> attached the technician visit to site on 08/22/16 and 01/23/17 <br /> when C1 and L1 alarm was cleared. We apologize that some <br /> alarms were not documented, but in the future we will do a <br />
The URL can be used to link to this page
Your browser does not support the video tag.