My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 9. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC# 17&18 UDC# UDC UDC# <br /> UDC Manufacturer: Western Fiberglass <br /> UDC Material: Fiberglass <br /> UDC Depth: 32" <br /> Height from UDC Bottom to Top 11" <br /> of Hi hest Pivin2 Penetration: <br /> Height from UDC Bottom to 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry <br /> testing: SEP 19 2011 <br /> Portion of UDC Tested' Water Line 13" <br /> Does turbine shut down when pER msec. ccs <br /> UDC sensor detects liquid(both Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail- yes <br /> safe shutdown?' <br /> Was fail-safe verified to be No <br /> operational?' <br /> Wait time between applying 5 Minutes <br /> water and starting test <br /> Test Start Time: 11:22 <br /> Initial Reading Rj): .001 <br /> Test End Time: 11:52 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Chane in Reading (RF—R,): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Yes <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(i)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.