My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ini 11FIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Ps- <br /> TYPE <br /> s TYPE OF ACTION 04 1.NEW PLAN ® 2.CHANGE OF INFORMATION 49ay <br /> PLAN TYPE 50 I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item ml ) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> L FACILITY INFORMATION r <br /> FACILITY ID M(A > <br /> gnrcy Use Only) <br /> BUSINESS NAME(Same.FACILITY NAME) A SCh P R C,O A M Q M is <br /> 101 CITY ST OUZO <br /> BUSINESS SITE ADDRESS \�AgSs S• 1 WPv�I �� <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive mmnteruncc,and cali6reuon of monitoring equipment(e.g.,xruors,probes,lire kak detectors.etc.)must be Performed a the fmque-y <br /> specified by the equipment menufxtraers'imtrucrions,m e Iaumlly,whichever is more frequent,and the such work must be performed by qualified prrwmie <br /> 23 CCR 2632 2634 2638 2641 Nay` <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): ~b <br /> 111.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLANANAP SUBMITTED WITH THIS PLAN. L SITE PLOT PLAN/MM PREVIOUSLY SUBMITTED. 123 CCR 1202, <br /> 26.0),w <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): .as <br /> 19 I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS (23CCR¢2632,2W) woe <br /> SECONDARY CONTAINMENT IS ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM woa <br /> PANEL MANUFACTURER.V E R o G IW5 C+ .� --Lc waio <br /> LEAK SENSOR MANUFACTURER:V � - MODEL NIS). <br /> wort <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WAL 12 MODEL M: <br /> (23 CCR 12643) wry <br /> PANEL MANUFACTURE -R MODEL <br /> wauwars <br /> IN-TANK PROBE MANUFACTURER: MODEL 6(S): <br /> b.DAILYMIGHTLY ❑ c.WEEKLY ~7 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ wo-t� <br /> ._....____.... ❑ d:MONTHLY.._._..__ _._ [I c.OTHER(SSped�f9:------_-- -._..W_.a_- <br /> lt <br /> PROGRAMMED TESTS: ❑ a.0.l g.pk ❑ b.0.2 g.pK ❑ c.OTHER(Specily): 4W19 <br /> woae <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR 12616.1): vo-yt <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 12645). TESTING PERIOD: [I e.36 HOURS ❑ b.60 HOURS 4°a2y <br /> wags <br /> 5.TANK INTEGRITY TESTING(23 CCR 12643.11: wou <br /> TEST FREQUENCY: ® a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Wass <br /> wo-u <br /> ❑99.OTHER (Specify): 490'31 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that Bpp�) <br /> I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br /> VISUAL ALARMS. (23CCR12636) yy <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM <br /> PANEL MANUFACTURER \I4'EDOR R O-T r9a3° MODEL#: \LC -3Sr3 4wst <br /> _ LEAK SENSOR MANUFACTURER-VCcE oR RN10-C y MODEL6(S): -32-3 wa» <br /> PINa• <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.c.,TURBINE)SHUTDOWN. ® YES ❑b.NO rsau <br /> FAILUREIDISCONNF.CTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 e.YES ❑b.NO wa35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3A gp .LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED CCR 2636 490.16 <br /> MLLD MANUFACTURER(S): *W37 MODEL 6(S): wa3a <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 gpli.LEAKTFSTS (23 CCR 126�36) +9as9 <br /> ELLD MANUFACTURER(S +90 0 MODEL#(S): wo 49°At <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 gp.h. ❑ 2.MINIMUM ANNUAL 0.1 gp.tL 990'43 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC KiMP SHUTDOWN. ®a YES ❑b.NO 99°'91 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®&YES ❑b.NO x9099 <br /> 4. <br /> PIPE INTEGRITY TESTING wogs <br /> TEST FREgUENCY 0 a.ANNUALLY b.EVERY 3 YEARS c.OTHERS i ww6 wa•4T <br /> 5.VISUAL PIPE MONITORING. +90'ea <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C MIN.MONTHLY d EACH TIME SYSTEM OPERATED- <br /> 62521113(h)(3) <br /> PERAT D`12111. 1 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR 126Wsx3)1. 490.x <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 21,CHAPTER 6,7 IS CONNECTED TO THE TANK SYSTEM <br /> I wasl <br /> was: <br /> ❑ 99.OTHER(Spealy) wase <br /> UPCF UST-D(12(2107)IN <br /> Scanned by CarnScanner <br />
The URL can be used to link to this page
Your browser does not support the video tag.