Laserfiche WebLink
a4 <br /> UST SYSTEM RETROFIT OR REPAIR AG EL <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[I NO[] AUG 04 2015 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer trainirrg'certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade,use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> 7/6/15 Revised Sope of work-Arch Rd Arco <br /> Cold started montoir due to power outage. <br /> Replace 89 and 91 turbine relays <br /> In place of Red Jacket CPT- Install FE Petro STP-SCI Smart Controller on both 87 tanks <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> Type H Relay <br /> FE Petro STP-SCI Single phase controller <br /> 3 <br />