Laserfiche WebLink
D. Results of Testing/Servicing s <br /> Software Version Installed: 329.01 JUN 0 7 2016 <br /> Com fete the followin checklist: <br /> ® Yes ❑ No' Is he audible alarm operational? _ <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected fund ovally tested and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment w 11 not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No- If alarms are relayed to a remote monitoring station,is all communications <br /> ® N/A equipment(e.g.,modem)operational? <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automaticelly shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors if <br /> positive shut-down? (Check all that appy) ® Sum <br /> Sensors; ®Dispenser Containment Sensors. P/Trench <br /> Did you confirm positive shut-down due to leaks And sensor failure/disconnection7 <br /> ®Yes; ❑No. <br /> ® Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ❑ N/A does ithe nstalled), <br /> is them trigger7overfill warning <br /> m ng alar visible and audible at the tank fill point(s)and operating property? If so,at what percent of tank capacity <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,Iden <br /> and model for all replacement parts in Section E,below specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> ❑Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appy) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> W Yes I ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> STACY ON SITE WITH EH . 2 TURBINS IN 87 STP. NO LD NUMBER 2 IN 87 STP. PERMIT IS OPEN <br /> E. Comments: AND SAID NEEDS 2 LIDS . ELITE WILL HAVE TO FIX PROB <br /> Monitoring System Certification Page 2 of 4 <br /> 2/21/07 <br />