Laserfiche WebLink
ARCH ARCO 4855 SOUTH HWY 99, EAST FRONTAGE ROAD, STOCKTON, CA <br /> Low <br /> Pa e2of2 <br /> -I <br /> Facili Em to ee Trainingyear. <br /> R <br /> All facility'employees have received the required on-the-job training within the past Y X <br /> I All facility'employees hired within the past 30 days have received the required on the job training. <br /> monthly Inspection— <br /> Y N NA Date Done <br /> X 02-16-16 <br /> Monitoring system certification(within past 12 months) X 02-16-16 <br /> Spill Bucket testing completed(within past 12 months) <br /> Leak Detector-mechanicaL'electronic for most sites(within past 12 months) X 02-16-16 <br /> The above ore usually lone together on an annual basis for local regulator. <br /> Line Tiehmess(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usuall) only after construction or when using SIR) X <br /> Secondan containment(SB989)tests have been completed(usually every 3 years) X 11-03-14 <br /> Other testing or maintenance completed as required List them below: <br /> ' Tzst'viaintenance: <br /> iesilla n[znance: <br /> lestMam enance: <br /> PRINTOUT INCLUDED yes® No ❑ NA ❑ <br /> Comments: L3 89 FILL SUMP MARCH 5T°AND APRIL 9TH <br /> CI 87 FILL,4LAR.4f APRIL 9TH <br /> L 36 9l FILL SUMP FUEL ALARM APRIL ]8TH <br /> J <br /> Incorrect dates listed for the monitoring system certification, spill bucket testing, and line leak detector testing <br /> Photo taken on: 2/14/2017 <br />