My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> F1 Other(Specify) <br /> Test F.quipmenl Used: Caldwell Syslems Lquipment Resoluticrni: .005 ;0 nein <br /> _ UDC# UDC# UDC# UDC# <br /> UDC "lanufaouler: - - <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No LINA ❑Yes ONO UNA ❑Yes 0N 0N ❑Yes El No Ll NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown? ❑Yes ❑No ❑NA ❑Yes 11No ❑NA 11Yes ElNo L1NA ❑Yes ❑No [INA <br /> Was fail-safe verified to be <br /> operational?* D Yes ❑No ❑NA ❑Yes ❑No Dx NA ❑Yes ❑No ❑NA ❑Yes E No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: <br /> Initial Reading(R,): .00" .00" .00" .00" <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: ❑-Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No LlNA x Yes ❑No El NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? x Yes ❑No ❑NA x Yes ❑No [INA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Comments— (include information on repairs made prior io testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.