Laserfiche WebLink
0 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> :om late the following checklist: <br /> ® Yes ❑ No' Is the audible alar operational? <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ NotWere, <br /> re all sensors visually inspected,functionally tested,and cenfirmed operational? <br /> ® Yes ❑ Noall sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> retion? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,Is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ❑ Yes ❑ No" For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ® NIA fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ❑ Sump/Trench <br /> Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failureldisconnection? ❑Yes; ❑No. <br /> ® Yes ❑ No For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overfill prevention valve is <br /> ❑ N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent of tank capacity <br /> does the alarm trigger? 90% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,Identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ®Yes' ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; M Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No. Is all monitoring equipment operational per manufacturer's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> IN TRANS SUMP WHEN I LIFTED LID SUMP FULL OF WATER AND SENSOR HANGING UP HIGHER <br /> THAN WATER .INSPECTOR RAY TOOK PICTURES AND TALKED TO MAN ON STAFF ABOUT HOW <br /> E. comments: TO HANDLE CLEANING SUMP . <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />