My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`Monitoring System Certification. <br /> Service Date: 10/14/2008 <br /> Address: 3515 Navy Dr. Stockton 95203 <br /> F. In-Tank Gauging/SIR Equipment ❑Check this box if tank gauging is used only for inventory control <br /> ®Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the fol owing checklist <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* I Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In the Section H below, describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors (LLD): ®Check this box if LLDs are not installed <br /> Com late the following checklist <br /> ❑Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> performance? <br /> ❑ N/A Simulated Leak Rate(check all that apply) ❑ 3.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ❑Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> El ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑N/A <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑ N/A <br /> ❑Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In the Section H below, describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> Gravity Drain, no product piping <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.