My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:18 AM
Creation date
11/8/2018 9:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PERSHING\4501\PR0231233\COMPLIANCE INFO 2010 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
8/26/2016 8:55:39 PM
QuestysRecordID
3176689
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HtULIVED <br /> E OCT 24 2013 <br /> F.In-Tank Gauging/SIR Equipment: F Check this box If tank gauging is used only ��f[_}4�+_( NTAL <br /> r Check this box if no tank gauging or SIR equipment is insta MENT <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes r No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes r No* Was accuracy of system product level readings tested? <br /> Yes r No* Was accuracy of system water level readings tested? <br /> Yes r No. Were all probes reinstalled properly? <br /> • Yes r No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> IT Yes r No* For equipment start-up or annual equipment certification f�was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; t 0.2 g.p.h. <br /> • Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes r No* Was the testing apparatus properly calibrated? <br /> • Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No* For electronic L Ds,does the turbine automatically shut off if the LLD detects a leak? <br /> • N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> • N/A <br /> Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> • N/A <br /> Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> • N/A <br /> • Yes r No* ere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.