Laserfiche WebLink
MONIT' 'RING SYSTEM CERW CATION <br /> CERTIFICATION / TEST DATE: Au ust 12, 2013 <br /> Al. FACILITY A2. OWNER <br /> Name 7-Eleven Market#2368/Store#17334 Name 7-Eleven, Inc <br /> Address 4501 North Pershing Street,Stockton,CA 95207 Address P.O. Box 711, Dallas,TX 75221 <br /> Phone# 209-951-6745 Phone# 805-523-2949 <br /> Contact Stephen Boyd contact Stephen Boyd <br /> F. IN-TANK GAUGING /SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yes ❑ No• I Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No• Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ Noe Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No• Were all probes reinstalled properly? <br /> L ❑ Yes ❑ No' Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> f — _ <br /> ' In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' For equipment start-up or annual equipment certification,was a leak simulated to verity LLD performance? <br /> ❑ WA (check all brat apply) Simulated leak rate: ■ 9 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yea ❑ Noe Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No For mechanical LLD$,does the LLD restrict product flow H It detects a leak? <br /> [I WA <br /> ❑ Yes <br /> ❑ Yes <br /> ❑ No• For electronic LLDs,does the turbine automatically aumautomaticallyshut off ti the LLD detectsa laak7 <br /> ❑ WA <br /> •❑ l For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system Is disabled <br /> ❑ WA or disconnected? <br /> 13 Yea ❑ Noe For electronic LLDs,does the turbine automatically shut oft H arty portion of the monitoring system malfunctions <br /> _ ❑ WA or falls a test? <br /> ❑ Yes ❑ No' For electronic LLOs,have all accessible wiring connections been visually Inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> ',2013 Walton Engineering,Inc. <br /> Page 3 of 3 <br />