Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps r <br /> Fill Riser Containment Sumps are Present, but were Not Tested r <br /> Test Method Developed By: r Spill Bucket Manufacturers: Industry Standard r Professional Engineer <br /> r Other (Specify): <br /> Test Method Used By: r Pressure r Vacuum s: Hydrostatic <br /> r Other (Specify): <br /> Test Equipment Used: LAKE TEST Equipment Resolution: 0 0625 in. <br /> Spill Box # Spill Box # <br /> Tank T-1 RUL Tank T-2 PUL Spill Box # Spill Box # <br /> Fill - Direct Fill -Direct <br /> Bucket Diameter: 14.00 14.00 <br /> Bucket Depth: 16.25 14.50 <br /> Walt time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test <br /> Test start Time: 09:15:00 09:15:00 <br /> Initial Reading 16.25 in. 14.50 in. <br /> Test End Time: 10:15:00 10:15:00 <br /> Final Reading F,): 16.25 in. 14.50 in. <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading mi 0.00 In. 0.00 In. <br /> Pass/Fail Threshold or Criteria: +/- 0.00 +/- 0.00 <br /> Test Result: Pass Pass: <br /> Comments? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO: 2306665 <br />