Laserfiche WebLink
.� <br /> SWRCB,January 2002 Page 1 of 1 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer 17 Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: rO—' Pressure r Vacuum <br /> r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: ¢auge Equipment Resolution: .20psi <br /> (Tank 1-rul) (Tank 2.-pull <br /> STP Containment I to 3/4 STP Containment 1 to 3/4 <br /> Piping Material: dw flex dw flex <br /> Piping Manufacturer: environ environ <br /> Piping Diameter: 2 in. 2 in. in. in. <br /> Length of Piping Run: 60 ft. 60 ft. ft. ft. <br /> Product Stored: RUL PUL <br /> Method and location of <br /> piping-run isolation: sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test: <br /> Test Start Time: 10:08:00 10:08:00 <br /> Initial Reading(RI): 5.00000 PSI 5.00000 PSI <br /> Test End Time: 11:08:00 11:08:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr I hr <br /> Change in Reading(RP-RO: 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or <br /> +/-0.00000 +/-0.00000 <br /> Criteria: <br /> Test Result: Pass Pass <br /> COMMCIlts-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />