My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:18 AM
Creation date
11/8/2018 9:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PERSHING\4501\PR0231233\COMPLIANCE INFO 2010 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
8/26/2016 8:55:39 PM
QuestysRecordID
3176689
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIT(- ZING SYSTEM CERTIF_DATION <br /> CERTIFICATION /TEST DATE: July 26, 2012 <br /> A7. FACILITY A2. OWNER <br /> Name 7-Eleven Market#2368/Store#17334 Name 7-Eleven, Inc <br /> Address 4501 North Pershing Street,Stockton,CA 95207 Address P.O.Box 711,Dallas,TX 75221 <br /> Phone# 209-951-6745 Phone# 805-523-2949 <br /> Contact Stephen Boyd Contact Stephen Boyd <br /> F. IN-TANK GAUGING/ SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No• Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yea ❑ No` Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No" Was accuracy of system product level readings tested? <br /> ❑ Yp ❑ No* Was accuracy of system water level readings toted? _ <br /> ❑ Yes ❑ No' Were all probes reinstalled property? <br /> ❑ Yes ❑ No• Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ WA (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No` Were all LLD&confirmed operational and accurate within regulatory requirements? _ <br /> ❑ Yea ❑ ll Was the testing apparatus properly calibrated? <br /> ❑ YM ❑ No a For mechanical LLDs,does the LLD restrict product flow H It detects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No a For electronic LLDs,does the turbine automatically shut oft H the LLD dialects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No" For electronic LLD*,does the turbine automatically shut off If any portion of the monitoring system Is disabled - <br /> ❑ WA or disconnected? <br /> ❑ Yes ❑ No" For electronic LLD%,does the turbine automatically shut off If any portion of the monitoring system malfunctions <br /> ❑ WA or falls a test? <br /> ❑ Yes ❑ No" For electronic LLD&,have all accessible wiring connections been visually Inspected? <br /> ❑ WA <br /> ❑ Yes ❑ No Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> ' In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> ©2012 Walton Englneenng,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.