My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:18 AM
Creation date
11/8/2018 9:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PERSHING\4501\PR0231233\COMPLIANCE INFO 2010 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
8/26/2016 8:55:39 PM
QuestysRecordID
3176689
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 1 of 1 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: I— Piping Manufacturer Industry Standard Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: Pressure r vacuum r'. Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .20 <br /> (Tank T-1-RUL)STP (Tank T-2-PUL)STP <br /> Containment 1 to 3/4 Containment 1 to 3/4 <br /> Piping Material: dw flex dw flex <br /> Piping Manufacturer: environ environ <br /> Piping Diameter: 2 in. 2 in. in. in. <br /> Length of Piping Run: 60 ft. 60 ft. it. fl. <br /> Product Stored: RUL PUL <br /> Method and location of stp sump stp sump <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test: <br /> Test Start Time: 09:30:00 09:30:00 <br /> Initial Reading(R1): 5.00000 PSI 5.00000 PSI <br /> Test End Time: 10:30:00 10:30:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI <br /> Test Duration: I hr I hr <br /> Change in Reading(RF-R1): 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-000000 +/- +/- <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br /> 1111 J <br /> SEP 2 4 2015 <br /> MIRONMENITAL <br /> WO:2324076 <br />
The URL can be used to link to this page
Your browser does not support the video tag.