Laserfiche WebLink
EE EIVEE <br /> OCT4 2014 <br /> F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory cont <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. _. �ViFNTAL HEALTI <br /> DEPARTMENT <br /> Complete the following checklist: <br /> • Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> rYes No* as accuracy of system product level readings tested? <br /> fT Yes No* Nas accuracy of system water level readings tested? <br /> (� Yes r No* Nere all probes reinstalled properly? <br /> • Yes f' No* Nere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): ❑Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • yes r No* or equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate:r3 g.p.h.; r 0.1 g.p.h; LJ 0.2 g.p.h. <br /> IT Yes r No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes r No* Nas the testing apparatus properly calibrated? <br /> IT Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> I— N/A <br /> • Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> IT N/A <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> (: N/A monitoring system is disabled or disconnected? <br /> • Yes f No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> r N/A onitoring system malfunctions or fails a test? <br /> • Yes r No* or electronic LLDs,have all accessible wiring connections been visually inspected? <br /> • N/A <br /> • Yes No* ere all items on the equipment manufacturers maintenance cheddist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />