My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/8/2018 9:51:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\1990 INSTALL.PDF
QuestysFileName
1990 INSTALL
QuestysRecordDate
12/6/2016 12:19:34 AM
QuestysRecordID
3271403
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Installation Instr�ions—All single and dmwole-wall tanks <br /> j Ai. Handling A3. Visual Air/Soap Testing <br /> Lifting Tanks Testing Single Wall Tanks <br /> Use inslallaGonlAt lug(sj to lift tank. Before installing tanks.remove fitting plugs,apply pipe dope and then <br /> I`. Larger tanks(10'and12'dia.) tighten fitting plugs.Pressure test 4'through l O'diameter tanks to 5 psi. <br /> have multiple lift lugs;all must be 12'diameter tanks to 3 psi.Soap the entire lank and fittings.The air test is <br /> used.Guide the tanks with guidegangle of little value without soaping and a careful visual inspection for bubbles. <br /> lines.Do not use chains or cablesgo" Test at least 30 minutes to insure there are no leaks as indicated by soap <br /> around tank.DO NOT STAND ON bubbles or a drop in pressure.Do not approach endcaps or manways-TANK WHILE TANK IS BEING while tanks are under pressure.Use an air gauge with half or quarter <br /> LIFTED. pound increments so that changes in pressure can be easily observed. <br /> Only use lifting equipment to move Do not use a vacuum gauge. <br /> tanks.Capacity of lifting equip- Before backfilling to grade,O/C Tanks recommends a 5 psi air/soap test <br /> ment must be checked before on all finished piping connections and unused fittings. <br /> movingtanks. <br /> Double-walf tanks cannot be Testing Double-Wall Tanks <br /> unloaded from the truck manually.Single wall fiberglass tanks,12,000 Double-wall tanks are shipped to the jobsite with a vacuum on the tank <br /> gallon capacity or less,may be manually unloaded from the truck at the cavity between the inner and outer lank.The vacuum should be left on the <br /> jobsite by the O/C Tanks trained truck driver. tank until the tank is ready to be air tested by the contractor.In the unlikely <br /> Do not roll or drop tank.For temporary storage at the jobsite,set tanks on event of shipping damage,this temporary vacuum serves as an early <br /> smooth ground free of rocks and foreign objects and rechock with the warning device.The vacuum can detect relatively"large"leaks in the <br /> tires or sandbags provided. inner or outer tank,but it cannot detect"small"leaks.Therefore prior to <br /> high are anticipated,the contractor responsible for tieing down Installation,all tanks must also be air tested and soaped using the <br /> If hi <br /> g pa following procedure: <br /> the tanks to prevent damage from being moved by high winds. <br /> Double-wall tanks 2,500 gallon capacity or larger are delivered to the job- excavation the <br /> plugvacan in the tank cavity. Pressefore setting tanks tohe 5 the <br /> site with bumper pads fastened to each end of the tank.The tank may be follows: plug and tighten all fittings.Pressure test tanks to5psi as <br /> installed with or without the bumper pads attached. <br /> Outer Wall Test: <br /> A2. Bed and Backfill CAUTION:Pressurizing the tank cavity over 5 psi may damage the <br /> tank.For all tests,install an air gauge at the fitting where the air <br /> 1 All excavated native soil must be pressure hose is connected to the tank and a second gauge at the <br /> replaced with approved backfill. other monitoring fitting.Use an air gauge with Y4 or%lb. <br /> 4 DO NOT MIX APPROVED increments so that changes in pressure can be easily observed. <br /> naturally GRAVEL WITH SAND OR NATIVE Using the OCF supplied manifold system connected to the inner tank and <br /> rounded SOIL.Alwaysusea roved the cavil between the inner and outer lank,pressurize the tank cavity gravel 3 gravel.Do ot back6lPin layers using air pressure from the inner tank. p <br /> 4 using sand or native soil F- <br /> 1 Step#1: j\ <br /> If your backfill does not meet With the manifold valve to the cavity closed,first pressurize the inner tank <br /> the specified requirements, to 5 psi maximum. <br /> 4 alternate materials may not be <br /> tog used without written approval <br /> from O/C Tanks. Pressurize the inner tank to 5 psi Maximum <br /> Gravel 10 dfiupply <br /> a^R arses* <br /> A clean naturally rounded agg re- CbBeO va^'e open <br /> 1 gate with a mix of particle sizes not xgage gw <br /> q less than ya"or more than 3/4"is <br /> j 1 required. <br /> Crushed Stone or Crushed <br /> crushed3 Gravel <br /> scone 4 1 Washed,crushed stone or gravel ".v:aa shrenr(swcrea w+m rarxl <br /> with angular particle size not less <br /> 2 than required. more than'h"are Step#1 nxxga:yrm5 <br /> 1 � required. <br /> 4 Note:All backfill materials must Step#2 <br /> meet ASTM C-33 paragraph 7.1 Close the air supply valve to the inner tank and then DISCONN ECT the air <br /> for quality and soundness.The supply. <br /> backfill should not have more <br /> than 3%passing a#8 sieve.The <br /> dry gravel density must be a minimum of 95 pounds per cubic foot. <br /> In freezing conditions backfill must be dry and free of ice. <br /> Note:You should require your backfill supplier to certify that the <br /> backfill meets this specification. <br /> j <br /> ft <br /> r <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.