Laserfiche WebLink
{{?i�yY,.�y};! -T^K��su -4 . --lin t.,. g. 1 h., Y rSd r r�r. 1 - y r -t-c .: •-! .. <br /> i <br /> JLD CONSIDER <br /> M: FITSF: <br /> ; ERG LASS PIPING <br /> '' as ri' •%h b ' <br /> 1 <br /> `, �.G:�.-.1111 ;tAf •!f:`Sr4 ;r..h" ,b!- : <br /> RED THREAD h double-wall secondary containment piping helps When the termination Concentric reducer with a tap is incl*IW in the <br /> Installers most EPA regulations and protect the environment sump,the complete system will be pressure testable. <br /> High FLOW Capacity with all concentrations of ethanol and belled fittings. For proper tapering, <br /> RED THREAD II pipe has a greater methanol, including 100'x, carefully follow the operaling instruc- <br /> ftow capacity than many other pipes Adhesive kits contain epoxy resin tions(bulletin 9106)included with the <br /> with the same U.D.This is because its and hardener in separate containers, tapering tool kil. <br /> high-strength, Fiberglass construction joint Cleaner, mixing stick,paint brush, Ibr detailed installation instructions <br /> provides a smoother J.D.and can pro- and paper towels. covering assembly, burial, lesting and <br /> videalarger l.D.forspeciftedpressures. A detailed instruction sheet is also repair,refer to Smith Fiberglass Products <br /> included Willi each kit.Refer toapprop- bulletin 1055 fur product piping and <br /> Thermal Conductivity riate installation bulletin for additional Ixrlletin 1190 for containment piping. <br /> The thermal conductivity of RED Information including cure cycle times. Handling and Storage <br /> I I IRFAD II pipe.is onlya fraction of that . Following these instructions will insure <br /> of steel. fasldndearyassemblyo(RED1'HKEAD II RED THREAD II pipe is packaged in <br /> Low Coefficient Of Piping systems, compact bundles of (our to eight <br /> lengths, Bundles of RFJ) THREAD II <br /> Linear Expansion Tapering <br /> p pipe urn be safely stored on level ground <br /> The coefficient of expansion of RED When RED THREAD 11 pipe is cut to or on racks with 10-font(or less)support <br /> i T14RFAD 11 pille is Vs to Ve that of thermo- length on the job site,the cul end must spacing.Reasonable care must be used <br /> PI•lskPipe and only twice that ofsteel. be retapered.A field tapering too[avail- in handling RED THREAD 11 pipe. Ido <br /> Adhesives used <br /> from Smith Fiberglass Products is not drop or throw RED I HREAD 11 pipe <br /> used for this purpose.The tool quickly on the ground or drop rocks or other <br /> fktsigned specifically for the RED applies the proper taper by a striving l,r rvy objects on it. Follow(lie proper <br /> TI IRFAD II piping system, the adhe- operation — similar to a pencil spar_ procedures for inspecting piping <br /> 'ves required for joining product and pener. Plain unthreaded field-made utale•.rials as stated in Smith Fiberglass <br /> _-TI <br /> piping are Smith Fiber- tapers can be joined with factory- Products installation bulletin 1055. <br /> glass Products DS-7000 series adhesives. installed threaded-IAli.Joint coupled for industry reference,uc API Pu68W1io4 161!/87 <br /> Testing of the adhesive systems ends.Either factory made TAQ.spigots 'ItuullaDar a u1ak1gt0WXl Pelh)k-M Stade 5W <br /> . time;and PWRP 1 MV"Rec6mnw WprMtkel lot <br /> showsthat they are compatible for use or field-made tapers may bejoined with Imulwrinoftlndctrro,naIkWstorage svuene , <br />