Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> ✓' /y_ Provide the name and address of the facility. <br /> Z. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s) , and operator(s). <br /> 3 Provide four complete sets of plans. (One to be retained by this office) . <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 1/4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> 1 . Location(s) and number of tanks. <br /> 1/2. Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> B. )Fiberglass OU1PM15. Coitnin I)v..akW&AW <br /> 1 . Striker plate dimensions and materials. <br /> 2. Striker plates under all accessible openings. <br /> C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual .inspection required). <br /> D. Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> ___1/3. Tank Capacity (List specific gallonage) . <br /> �A. Contents to be stored in each tank (Be specific). <br /> A. Verification of product compatability with the tank(s). piping, monitoring <br /> device(s) , epoxy or silicone glues, etc. <br /> 1 . List testing organization and approval . <br /> V5. Provide manufacturers written installation instructions. (Include all piping, <br /> monitors, tanks, etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is require on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> Ne test result copy to be sent directly to this department from the <br /> testing company. <br />