My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/8/2018 9:51:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\1990 INSTALL.PDF
QuestysFileName
1990 INSTALL
QuestysRecordDate
12/6/2016 12:19:34 AM
QuestysRecordID
3271403
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. .i <br /> OPTION IA <br /> ARTICLE 3, SECTION 2631 <br /> MOTOR VEHICLE OR NONMOTOR VEHICLE FUEL TANK <br /> CONSTRUCTION STANDARDS <br /> ✓l . Secondard containment provided. <br /> Primary containers shall be product tight. <br /> 3. Secondary containers <br /> A. Thickness, density, composition, and product compatibility. <br /> B. Sized to contain unauthorized releases for sufficient time to allow <br /> detection and removal . <br /> 4. Secondary container volumetric requirements <br /> A, Single primary container = 100%. <br /> B. Multiple primary containers = 150% of largest primary container or <br /> 10% above -aggregate. <br /> 1 . Document interproduct compatibility <br /> 5. Secondary containers open to rainfall . <br /> A. Volumetric requirement = 24 hours of 25 year storm in addition to <br /> jprimary container volumes. <br /> b. Pore space of granular material used as backfill for the primary containers. <br /> / A. Refer to Section 2631 (g). <br /> �/. Secondard container equipped with a collection system. <br /> A. Designed to: <br /> 1 . Accumulate <br /> 2. Temporarily store <br /> 3. Permit removal of: <br /> a. Precipitation <br /> b. Subsurface infiltration <br /> c. Released hazardous substances from primary container(s) . <br /> �8. Floor of Secondary container <br /> A. Constructed on firm base <br /> B. Sloped to collection sump (1/8" per foot) . <br /> 1 . One or more access casings installed in sump <br /> a. Sized to allow removal of collected liquid <br /> b. Extend to ground surface <br /> c. Perforated in sump region. <br /> d. Covered with a locked waterproof cap or within a secured facility <br /> e. Thick enough to withstand anticipated stresses <br /> f. Construction materials: <br /> 1 ) Are not weakened by stored product <br /> 2) Will not donate, capture, or mask constituents to be analyzed. <br /> 9. Membrane liner specifications: <br /> A. Refer and comply with Article 3, Section 2631 J. k, 1 , and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.