Laserfiche WebLink
Site Preparatio*94nd Installation Manual <br /> TLS-2501 Tank Level Sensing System <br /> L SECTION 3. MONITOR INSTALLATION .- <br /> 'iv A. PROBE AND SENSOR WIRING INSTALLATION. full <br /> two conductors of color-coded,THWN stranded copper wire <br /> between the monitor and each probe and sensor location I° ' <br /> (Since up to four probes and eight sensors will he wired s i <br /> through the single probe wiring conduit,be sure to use a <br /> different color-code for each connection).The wires must <br /> be of a type designed for use in the presence of gasoline and <br /> oil,and must be between AWG 22 and AWG 1 ti.The conduit <br /> _ must be properly sealed in accordance with the National <br /> Electrical Code (NFPA 70) and the Flammable and Coin <br /> bust.ible Liquids Code(NFPA 30)since they pass from a Glass <br /> 1,Division for Division 11 area into it non-luvardous area. <br /> Note: Label or color code all field wiring to ensure polarity. ••„•, „ ,,, <br /> IMPORTANT:IT IS CRITICAL THAT YOU IDENTIFY AND <br /> MAINTAIN THE RELATIONSHIP OF IN'T'ERSTITIAL <br /> AND PIPING SUMP SENSORS TO THEIR POST- <br /> TIONS ON THE TERMINAL STRIP IN THE CON- ••,.w�e,,,..0 <br /> SOLE DURING THE WIRING PROCEDURE. FAIL- <br /> URE TO DO SO COULD RESULT IN IMPROPER ••••. <br /> IDENTIFICATION OF A LEAK LOCATIONI YOU <br /> MUST MAINTAIN A VARIFIABLE RELATIONSHIP <br /> BETWEEN THE SENSORS AND PROBES IN TANKS <br /> AND THEIR CONNECTIONS ON THE WIRING <br /> STRIP. APPENDIX A PROVIDES A FORM TO RE- <br /> CORD DATATO HELP YOU IDENTIFY THE WIRING <br /> SCHEME. <br /> B. POWER WIRE INSTALLATION. Pull four (4) color- <br /> coded wires for line, neutral,barrier ground (must be s 12 AW <br /> AWG or larger)and chassis ground between power panel and <br /> TLS Monitor. Figure ti. (larder Covet- <br /> CAUTION: <br /> overCAUTION:DO NOT CONNECT POWER SI IPPLY WI ICES TO A <br /> LIVE CIRCUIT UNTIL ALL OTHER PROBE AND <br /> MONITOR WIRING IS COMPLETE.. D. POWER WIRING CONNECTIONS. <br /> WARNING:IN INSTALLATION OF THIS PRODUCT,COM- <br /> C. MOUNTING. (See Figure 4 for dimensions and mount- PLY WITH THE NATIONAL. ELECTRICAL CODE; <br /> ing requirements.) FEDERAL,STATE,AND LOCAL CODES;AND ANY <br /> 1. Locate and mark mounting points (4) at. the location OTHER APPLICABLE SAFETY CODES. IN ADDI- <br /> selected in 2.C.1 (See Figure 4,"Monitor Dimensions and TION,TAKE NECESSARY PRECAUTIONS DURING <br /> Installation Requirements").BE SURETO CONSIDF.RTHE INSTALLATION, SERVICE AND REPAIR TO PRE- <br /> WEIGHT OF TIIE TLS MONITOR AND THE MOUNTING VENT PERSONAL. INJURY, PROPERTY LOSS AND <br /> SURFACE MATERIAL WHEN SELECTING A MOUNTING EQUIPMENT DAMAGE. <br /> FASTENER. WARNING:TURN OFF POWER TO THE SYSTEM BEFORE <br /> 2. Irthe fastening device requires an insert in the mounting OPENING THE FRONT PANELS TO AVOID SHOCK <br /> surface,drill the appropriate holes and install the inserts. FROM THE POWERSUPPLY.INADDITION,POWER <br /> TO THE SYSTEM MUST BE TURNED OFF BEFORE. <br /> 3. Loosen the four slot-head screws on the right and left OPENING OR SECURING THE BARRIER COVER. <br /> edges of the front panel and swing the panels open. IF HIGH VOLTAGE IS SHORTED ACROSS ANY <br /> 4. Locate the hinged intrinsically-safe barrier rover,remove BARRIER PROBE TERMINAL, EXPLOSION OR <br /> the two screws and open the cover.(See Figure ti.) FIRE COULD RESULT. <br /> 5. Mount the monitorthroughthe four mounting holes inthe I`owerSupplyRat,ing: <br /> back of the monitor case. Input.power:(LI, N,(1); 120 V ac,50/60liz, 100W Max. <br /> Output. power:Alarm relay contarts,resistive load — <br /> 6. Connect power and probe/sensorconduits in appropriate 115 V ac, 2A Max.or, 230 V ac,•LA Max.or,30V de, 2A <br /> knockouts. Max. <br /> 5 <br />