Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAI�- <br /> �1 . Provide the name and address of the facility. <br /> /�2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s), and operator(s). <br /> r' <br /> ✓ 3. Provide four complete sets of plans. (One to be retained by this office). <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> _2plans. <br /> 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS /m �11�� <br /> 1 . Location(s) and number of tank <br /> 2. Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> B. Fiberglass �%�,y/P �U � � <br /> 1 . Striker plate dimensions and materials. ���cK�uaFEie�P%�U.` <br /> 2. Striker plates under all accessible openings. <br /> C. Nonclad steel —ra n_j�z j'`� �l�/ u-0�cC/� G� � <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required) . <br /> D. Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> 3. Tank Capacity (List specific gallonage) . IV14 <br /> 4. Contents to be stored in each tank (Be specific). <br /> A. Verification of product compatability with the tank(s), piping, monitoring <br /> device(s) , epoxy or silicone glues , etc. <br /> 1 . List testing organization and approval . <br /> 5. Provide manufacturers written installation instructions. (Include all piping, <br /> monitors, tanks, etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is require on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> One test result copy to be sent directly to this department from the <br /> testing company. <br />