Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 125.02 <br /> :om late the follow:- checklist: <br /> ® Yes ❑ No" Is the audible alarm operational? <br /> ® Yes ❑ No- Is the visual alarm operational? <br /> ® Yes ❑ No- Were all sensors visually inspected,functionally tested,and confirmed operetlonal? <br /> ® Yes ❑ No, Were all sensors installed at <br /> El Yes 13 No- lowest paint of secontla <br /> operation? ry containment and positioned so that other equipment will not interfere with their proper <br /> If alarms are relayetl to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No, Por pressurized piping systems,does the turbine automatically shut tlown if the i in secontla <br /> ❑ N/A fails to operate, or is eledricelly tlisconneIXed7 If yes: which sensors initiate positive shut-tlown? (Check a//that a <br /> Sensors; ry containment monitoring system detects a leak, <br /> ®Dispenser Containment Sensors. <br /> Ditl you confirm positive shut-down tlue to leaks and sensorfailure/disconnection? Sump/Trench <br /> ❑ Yes ❑ No" For tank systems that utilize the monitoring system as the primary tank overfill wa®ing device(i.e., no mechanical overfill prevention valve is <br /> ❑No. <br /> ® N/A installetl),is the overfill warning alarm visible antl audible at the tank fill points)antl operating pro ed '+ <br /> tloes the alarm trigger? % <br /> ❑ ® No Was any monitoring equipment replacetl7 If yes,itlentify specific sensors,probes,or other equipment replaced and h list the cmanufacinurer name <br /> ty <br /> Yes and motlel for all replacement parts in Section E,below, <br /> ❑ ® No Was liquid found inside any secondary containment systems Check all tlesignetl as tl s stems? a <br /> Yes ❑ duck Pro ❑Water. If yes,describe causes in Section E,below. ry y / PP!Y) <br /> ® Yes ❑ N . <br /> ` Was monitoring system set-u <br /> ® Yes ❑ Np reviewetl to ensure proper seAttach set up reports,if applicable <br /> oIs all ttings? <br /> monitodn <br /> g equipment operational per manuhacturer's specifications? <br /> "In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> r� <br /> Monitoring System Certification <br /> Page 2 of 4 <br /> 2/21/07 <br />