Laserfiche WebLink
Monitoring System Certification • <br /> UST Monitoring Site Plan <br /> Site Address: E.F.KLUDT 1126 E.PINE STREET LODI CA 95240 <br /> NEXT TO BUILDING <br /> F <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . A=ANNULAR . . . <br /> . . . . . F=FILL <br /> P-0P--PROBE <br /> T=TURBINE <br /> F—Q _ X=SENSAOR <br /> V=VAPOR(NONE) <br /> V . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . OUTER CORNER. . <br /> . . . . . . . . . . . . . . . . . . . . <br /> O O O XT . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .105.1 X 9. 9 � �x� . � �X� 7.• .. ,• .. •• ,• .• <br /> . . . . . . . . . . . . . .� . . . . �. . . . . . . . . 7 <br /> . <br /> T <br /> O O <br /> . . I . E . . I . . . . . . . . . . . . <br /> Date map was drawn:4/6/11. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> Probes(if used for leak detection). In the space Provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 3 of 4 <br /> 2/21/07 <br />