Laserfiche WebLink
1.00 <br /> FIBERGLASS DOUBLE-WALL SUMP INSTALLATION INSTRUCTIONS <br /> _MXJEZ • ALL ADHESIVE JOINTS(KIT AD) <br /> TEMPERATURE CONSIDERATIONS: Follow these steps: <br /> • Recommended method for supplemental heat is to 1. Check adhesive container for expiration date. <br /> transfer warm air to the sump while keeping ignition 2. Thoroughly mix two part adhesive by hand or with <br /> sources away. a power mixer following the mixing instructions <br /> Cool Weather(less than 607): contained in the adhesive kit. <br /> • Preheat the resin or adhesive to 60-75°F 3. Fill channel with adhesive using the grout bag or <br /> • <br /> application tool. <br /> Before adhesive is applied, add 4Make two consecutive 360° passes with adhesive <br /> supplemental heat.t.Apply <br /> Apply heat to keep joint surfaces .aces <br /> over 60°F. around each channel. <br /> • After adhesive or layup is applied, continue to apply 5. Allow adhesive to cure at least 24 hours without <br /> supplemental heat until it hardens(30 minutes moving the joined parts. <br /> minimum). FIGURE C-1 <br /> Warm Weather(between 61°F and 850F): <br /> DW Body <br /> • Adhesive or hand layup will harden in approximately <br /> 30 minutes. Adhesive <br /> • No supplemental heat required. Adhesive <br /> Hot Weather(above 85°F): Channels <br /> • Apply adhesive or layup more rapidly (adhesive and <br /> resin may harden in less than 10 minutes). channel <br /> Mesh <br /> • To increase working time, cool the adhesive or resin <br /> to 60°F to slow down chemical reaction. <br /> I <br /> DW Collar <br /> or Body <br /> The adhesive/resin materials and vapors are flammable. <br /> To prevent fire or explosion hazard, if a heat gun(or ALL LAYUP JOINTS (KIT LK) <br /> other ignition source)is used for supplemental heat,first <br /> evacuate flammable vapors which may accumulate in the Follow these steps: <br /> sump. <br /> Tank sumps may be a confined space. Follow proper 1. Thoroughly mix resin and catalyst following the <br /> safety procedures. mixing instructions in the layup kit. <br /> 2. Resin coat previously ground mating surfaces. <br /> oil I 3. Apply 3 layers glass layup saturated with resin <br /> 360°around sump, centered joint.Alllayup <br /> joints must overlap a minimumm not <br /> of 1" but not <br /> 16 *k exceed 2" in circumferential direction. <br /> ASPHV%IATION FIRE EXPLOSION 4. Roll layup until all air is removed. <br /> TIM <br /> 5. Allow layup to cure at least 24 hours without <br /> moving the joined parts. <br /> Always wear protective goggles and gloves when mixing FIGURE C-2 <br /> and applying adhesive and resin.The liquid materials <br /> are flammable. Keep adhesive and resin away from DIN Body <br /> sparks and ignition sources. <br /> } <br /> 4 3" Layers of Glass <br /> w/Resin(Y Past <br /> 3.. Each Joint) <br /> 4., <br /> } <br /> DW Collar <br /> or Body <br /> 5 <br />