Laserfiche WebLink
-27- <br /> Executive Order VR-202-A <br /> Healy Phase II EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> Figure 213-19 <br /> Healy Systems Scheduled Maintenance <br /> 1.0 Scheduled Maintenance Instructions for a Healy Systems with VP1000 Vacuum <br /> Source and 900 Series EVR Nozzle. <br /> By design, the Healy System requires limited maintenance. Initial problems are <br /> usually caused by installation irregularities that are easily detected and repaired <br /> by performing the "VP1000 Vacuum Performance Test Procedure" located in the <br /> dispenser installation manual. Periodic maintenance described here will <br /> eliminate problems and maintain peak operation of the system. <br /> Note: Only a Healy Certified Technician can service any problems discovered <br /> while conducting the Weekly or Quarterly Inspection and Testing. For <br /> information regarding Healy Certified Training Courses please contact a local <br /> Healy Distributor. Healy Distributors can be found on the Healy website @ <br /> www.healysystems.com - or you can call Healy Systems direct @ 603-882-2472 <br /> for more information. <br /> 1.1 Weekly Inspection and Testing <br /> • Inspect each nozzle, hose, and breakaway for damage, loose <br /> connections, or leaks. Inspect nozzles for damaged vapor boots or <br /> spouts. Any nozzle with a vapor collection boot which is missing, or <br /> which has one half of the mini-boot faceplate or greater missing <br /> should be replaced or repaired as soon as practicable. Spouts with <br /> visible damage must be replaced. <br /> • Inspect hoses for wear, severe kinks, cracks, and splitting. <br /> Replace if wire braid is visible. <br /> • Test the VP1000 Vacuum Pump for normal operation using the <br /> following test procedure: <br /> • Normal operation will have the VP1000 Vacuum Pump <br /> running at low speed if only one side of a dispenser / pump <br /> is activated (ready to dispense fuel) and will run at full speed <br /> if both sides of the dispenser are activated (ready to <br /> dispense fuel). The VP1000 vacuum pump may continue to <br /> run for a few seconds after a nozzle is reholstered. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />