Laserfiche WebLink
• -29- <br /> 1.3 Annual Inspection and Testing to Be Performed By a Healy Certified Technician. <br /> The following procedures are recommended to be conducted in the order listed. <br /> 1.3.1 Perform weekly and quarterly inspection prior to Annual Inspection. <br /> 1.3.2 Conduct static pressure performance of the Healy Clean Air <br /> Separator (EO VR-202-A, Exhibit 4). <br /> 1.3.3 Conduct pressure decay test (TP 201.3 and EO VR-202-A, Exhibit <br /> 8). <br /> 1.3.4 Conduct dispenser vapor line tightness test found in the Healy <br /> dispenser manual under "testing the system" for each dispenser at <br /> GDF. Repair all leaks. <br /> 1.3.5 Conduct V/L test on all nozzles (EO VR-202-A, Exhibit 5). Adjust <br /> and replace as necessary. <br /> 1.4 Procedure for Reconnecting Breakaway and Testing Fueling Point after Drive- <br /> Off. <br /> Note: The following procedure does not require a Healy Certified <br /> Technician. If any of the tests listed requires removing the fueling <br /> point or dispenser from service, contact a Healy Certified Technician. <br /> Breakaway reconnections and/or service by a Healy Certified <br /> Technician shall be logged in the GDF Maintenance Log. <br /> 1.4.1 After a Drive-Off, inspect the nozzle, hose and breakaway for <br /> damage. Spouts with visible damage must be replaced. Hoses <br /> with wire braid showing must be replaced. <br /> 1.4.2 Reconnect the breakaway assembly per the procedure in the <br /> Reconnectable Breakaway Coupling (PIN 8701 VV) section of the <br /> ARB Approved Installation, Operation and Maintenance Manual of <br /> the Healy Phase Il EVR System Including Veeder-Root ISD <br /> System. This procedure requires the use of the Healy reconnection <br /> clamp, PIN 795. Verify that the tip of the shear screw installed prior <br /> to the Drive-Off is removed from the dispenser end body <br /> (connected to the whip hose) of the breakaway. <br /> Note: Do not remove the hose or nozzle from the bottom section of <br /> the breakaway, as the breakaway is holding the liquid gasoline in the <br /> hose/nozzle. <br /> 1.4.3 Authorize dispenser and inspect the hanging hardware for liquid <br /> leaks and meter creep (fueling position display is counting up <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />