Laserfiche WebLink
0 -31- • <br /> 1.4.4.2 Install a plastic bag around the portion of the breakaway still <br /> connected to the dispenser whip hose. The plastic bag <br /> shall be large enough to enclose the breakaway and shall <br /> have a thickness of no greater than 2 mils. In California, 12" <br /> x 20" x 2 mil thick bags are available from the Air Resources <br /> Board by calling (800) 952-5588. <br /> 1.4.4.3 Initialize the dispenser for fueling. Do not dispense any <br /> fuel. <br /> 1.4.4.4 With the dispenser initialized, observe the bagged <br /> breakaway for a half a minute. <br /> 1.4.4.5 If the bag collapses (indicating the breakaway is not <br /> maintaining vapor integrity), or liquid leaks or meter creep <br /> are observed, remove the dispenser from service. If the <br /> bag does not collapse (indicating the breakaway is <br /> maintaining vapor integrity) and no liquid leaks or meter <br /> creep are observed, the dispenser can remain in service. <br /> 1.4.5 The following tests shall be performed after passing sections 1.4.3 <br /> and 1.4.4 of this procedure. <br /> 1.4.5.1 Test the insertion interlock feature of the nozzle using the <br /> procedures outlined in Sections 1.1.7 and 1.1.8 in the Healy <br /> Model 900 Nozzle section of the ARB Approved Installation, <br /> Operation and Maintenance Manual for the Healy Phase 11 <br /> EVR System Including Veeder-Root ISD System. If the <br /> nozzle fails either of these tests, remove the fueling point <br /> from service. <br /> 1.4.5.2 Test the automatic shutoff feature of the nozzle using the <br /> procedures outlined in Sections 1.2.8, 1.2.9 and 1.2.10 in <br /> the Healy Model 900 Nozzle section of the ARB Approved <br /> Installation, Operation and Maintenance Manual for the <br /> Healy Phase Il EVR System Including Veeder-Root ISD <br /> System. If the nozzle fails any of the tests, remove the <br /> fueling point from service. <br /> For more information about testing and /or maintenance of Healy products, contact <br /> Healy Technical Services @ (603) 882-2472. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />